A new mathematical model for the workover rig scheduling problem

journal contribution
posted on 2024-11-02, 03:35 authored by Miguel Perez, Fabricio Pinheiro De Oliveira, Silvio Hamacher
One of the most important activities in the oil and gas industry is the intervention in wells for maintenance services, which is necessary to ensure the constant production of oil. These interventions are carried out by workover rigs. Thus, the Workover Rig Scheduling Problem (WRSP) consists of finding the best schedule to service the wells while considering the limited number of rigs with the objective of minimizing the total production loss. In this study, a 0-1 integer linear programming model capable of effi- ciently solving the WRSP with a homogeneous fleet of rigs is proposed. Computational experiments were carried out using instances based on real cases in Brazil to compare the results obtained by the proposed model with the results reported by other methods. The proposed model was capable of solving all instances considered in a reduced computational time, including the large instances for which only approximate solutions were presently known.

History

Related Materials

  1. 1.
  2. 2.
    ISSN - Is published in 01017438

Journal

Pesquisa Operacional

Volume

36

Issue

2

Start page

241

End page

257

Total pages

17

Publisher

Sociedade Brasileira de Pesquisa Operacional

Place published

Brazil

Language

English

Copyright

© 2016 Brazilian Operations Research Society.

Former Identifier

2006072003

Esploro creation date

2020-06-22

Fedora creation date

2017-03-21

Usage metrics

    Scholarly Works

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC