Bi-objective resource-constrained project scheduling with robustness and makespan criteria

journal contribution
posted on 2024-11-01, 09:04 authored by Babak AbbasiBabak Abbasi, Shahram Shadrokh, Jamal Arkat
Resource-constrained project scheduling problem (RCPSP) is one of the most important problems in the context of project scheduling. Considering a single objective, such as makespan minimization, net present value minimization or cost minimization has been the cornerstone of most studies done so far. At the other hand, taking this problem into account as a multi objective one has not been well studied. In this paper, a bi-objective model of RCPSP is presented. The first objective is makespan to be minimized, and the second one, a recently developed measure, is robustness maximization aimed at floating time maximization to make scheduling more reliable. The problem formed in this way is an NP-hard one forcing us to use simulated annealing algorithm to obtain a global optimum solution or at least a satisfying one. Finally, we have illustrated our new algorithm using a numerical example with different weights for robustness. (As an example, when robustness weight is zero, the problem will be solved as a makespan objective.).

History

Related Materials

  1. 1.
    DOI - Is published in 10.1016/j.amc.2005.11.160
  2. 2.
    ISSN - Is published in 00963003

Journal

Applied Mathematics and Computation

Volume

180

Issue

1

Start page

146

End page

152

Total pages

7

Publisher

Elsevier Inc.

Place published

United States

Language

English

Copyright

© 2006 Elsevier Inc. All rights reserved.

Former Identifier

2006022957

Esploro creation date

2020-06-22

Fedora creation date

2011-11-14

Usage metrics

    Scholarly Works

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC