RMIT University
Browse

Discrete time model and algorithms for container yard crane scheduling

journal contribution
posted on 2024-11-01, 17:26 authored by Wenkai Li, Yong Wu, Matthew Petering, Mark Goh, Robert De Souza
Container terminal (CT) operations are often bottlenecked by slow YC (yard crane) movements. PM (prime mover) queues in front of the YCs are common. Hence, efficient YC scheduling to reduce the PM waiting time is critical in increasing a CT's throughput. We develop an efficient model for YC scheduling by taking into account realistic operational constraints such as inter-crane interference, fixed YC separation distances and simultaneous container storage/retrievals. Among them, only inter-crane interference has ever been considered in the literature. The model requires far fewer integer variables than the literature by using bi-index decision variables. We show how the model can be solved quickly using heuristics and rolling-horizon algorithm, yielding close to optimal solutions in seconds. The solution quality and solution time are both better than the literature even with additional constraints considered. The proposed formulations and algorithms can be extended to other problems with time windows and space constraints.

History

Related Materials

  1. 1.
    DOI - Is published in 10.1016/j.ejor.2008.08.019
  2. 2.
    ISSN - Is published in 03772217

Journal

European Journal of Operational Research

Volume

198

Issue

1

Start page

165

End page

172

Total pages

8

Publisher

Elsevier BV

Place published

Netherlands

Language

English

Copyright

© 2008 Elsevier B.V. All rights reserved

Former Identifier

2006049797

Esploro creation date

2020-06-22

Fedora creation date

2015-01-21

Usage metrics

    Scholarly Works

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC