Framework for improving workflow stability: deployment of optimized capacity buffers in a synchronized construction production

Download (338.95 kB)
journal contribution
posted on 2024-11-23, 09:13 authored by Mehrdad Arashpour, Ronald WakefieldRonald Wakefield, Nick BlismasNick Blismas, Eric Lee
Construction sites are dynamic environments due to the influence of variables such as changes in design and processes, unsteady demand, and unavailability of trades. These variables adversely affect productivity and can cause an unstable workflow in the network of trade contractors. Previous research on workflow stability in the construction and manufacturing domains has shown the effectiveness of 'pull' production or 'rate driven' construction. Pull systems authorize the start of construction when a job is completed and leaves the trade contractor network. However, the problem with pull systems is that completion dates are not explicitly considered and therefore additional mechanisms are required to ensure the due date integrity. On this basis, the aim of this investigation is to improve the coordination between output and demand using optimal-sized capacity buffers. Towards this aim, production data of two Australian construction companies were collected and analyzed. Capacity and cost optimizations were conducted to find the optimum buffer that strikes the balance between late completion costs and lost revenue opportunity. Following this, simulation experiments were designed and run to analyze different 'what-if' production scenarios. The findings show that capacity buffers enable builders to ensure a desired service level. Size of the capacity buffer is more sensitive to the level of variability in contractor processes than other production variables. This work contributes to the body-of-knowledge by improving production control in constructionanddeploymentof capacity buffers to achieve a stableworkflow.In addition, constructioncompaniescanuse the easy-to-use framework tested in this study to compute the optimal size for capacity buffers that maximizes profit and prevents late completions.

History

Related Materials

  1. 1.
    DOI - Is published in 10.1139/cjce-2014-0199
  2. 2.
    ISSN - Is published in 03151468

Journal

Canadian Journal of Civil Engineering

Volume

41

Issue

12

Start page

995

End page

1004

Total pages

10

Publisher

N R C Research Press

Place published

Canada

Language

English

Copyright

© 2014 Canadian Science Publishing

Former Identifier

2006050067

Esploro creation date

2020-06-22

Fedora creation date

2015-01-28

Open access

  • Yes