RMIT University
Browse

Load sharing and structural response of roof–wall system in a timber-framed house

journal contribution
posted on 2024-11-02, 14:59 authored by Satheeskumar NavaratnamSatheeskumar Navaratnam, David Henderson, John Ginger, Mitchell Humphreys, C Wang
Full-scale tests were carried out on a part of representative brick veneer contemporary house to assess the loading effects on roof to wall connections and load sharing. Tests were carried out at each stage of construction: bare frame followed by the installation of roof battens and cladding, wall lining, ceiling, etc. These construction stages were used to assess the contribution of the structural and lining (i.e. ceiling, ceiling cornice and wall lining) elements to the load sharing and response of the timber-framed house structure to wind loading. Results of the full-scale test show that the vertical reaction force at the loaded truss support was reduced by about 20% when the lining elements were added to the system with structural elements (i.e. truss, batten and roof cladding). The vertical load sharing of the timber-framed house through the roof to wall connection (RWC) depends on the stiffness of the RWC and the truss location (i.e. whether located at the end or middle). The contribution of the lining elements to the vertical load sharing is about 15–20%. The lateral load resistance of RWCs significantly increased, when ceiling, ceiling cornice and wall lining were added to the structural system. The outcome of this study can be used to assess the structural response and vulnerability of these houses to windstorms.

History

Journal

Engineering Structures

Volume

122

Start page

310

End page

322

Total pages

13

Publisher

Elsevier

Place published

United Kingdom

Language

English

Copyright

© 2016 Elsevier Ltd

Former Identifier

2006104844

Esploro creation date

2021-04-21

Usage metrics

    Scholarly Works

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC