RMIT University
Browse

Resource constraint scheduling with a fractional shared resource

journal contribution
posted on 2024-11-01, 14:06 authored by Gaurav Singh, Andreas Tilman Ernst
We consider a scheduling problem motivated by mining in remote off-grid areas. In this model, mines have pre-assigned mineral processing jobs and their own machine for executing these jobs. Each job also needs a certain amount of electricity in order to get completed. The electricity, on the other hand, is of limited supply and must be shared between the mines. We present a mathematical formulation of the problem and a Lagrangian relaxation based heuristic. Computational results which compares our heuristic with genetic algorithm and simulated annealing are also presented.

History

Related Materials

  1. 1.
    DOI - Is published in 10.1016/j.orl.2011.06.003
  2. 2.
    ISSN - Is published in 01676377

Journal

Operations Research Letters

Volume

39

Issue

5

Start page

363

End page

368

Total pages

6

Publisher

Elsevier Science

Place published

Amsterdam, Netherlands

Language

English

Copyright

© 2011 Elsevier B.V. All rights reserved.

Former Identifier

2006041543

Esploro creation date

2020-06-22

Fedora creation date

2015-01-16

Usage metrics

    Scholarly Works

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC