RMIT University
Browse

Scheduling in iron ore open-pit mining

journal contribution
posted on 2024-11-01, 18:15 authored by Maksud Ibrahimov, Arvind Mohais, Sven Schellenberg, Zbigniew Michalewicz
During the last few years, most production-based businesses have been under enormous pressure to improve their top-line growth and bottom-line savings. As a result, many companies are turning to systems and technologies that can help optimise their supply chain activities. In this paper, we discuss a real-world application of scheduling in the mining industry. This is a highly constrained problem with some of the constraints changing over time. The objective is to generate a plan that meets the quality and tonnage targets by utilising the provided equipment and machines. The mathematical model is described in detail, and a three-module complex algorithm based on computational intelligence is proposed. The main software functionality is also described. The developed software is currently in the production use.

History

Related Materials

  1. 1.
    DOI - Is published in 10.1007/s00170-014-5619-8
  2. 2.
    ISSN - Is published in 02683768

Journal

International Journal of Advanced Manufacturing Technology

Volume

72

Issue

42221

Start page

1021

End page

1037

Total pages

17

Publisher

Springer-Verlag London Ltd

Place published

United Kingdom

Language

English

Copyright

© Springer-Verlag London 2014

Former Identifier

2006051619

Esploro creation date

2020-06-22

Fedora creation date

2015-04-20

Usage metrics

    Scholarly Works

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC