RMIT University
Browse

Tactical capacity planning in a real-world ETO industry case: A robust optimization approach

journal contribution
posted on 2024-11-02, 01:49 authored by Andrea Carvalho, Fabricio Pinheiro De Oliveira, Luiz Scavarda
Uncertainty has a significant impact on the stability and performance of engineering-to-order (ETO) production systems by affecting due date achievement, efficient resource allocation and the usage of nonregular working force. Proactive planning approaches consider information about uncertainty to protect the generated plans against future disruption. Likewise, this paper´s goal is to propose and apply a robust optimization model that addresses a tactical capacity planning problem by incorporating uncertainties regarding the duration of production processes. The model aims at solution robustness (or stability) and intends to enhance and support the decision-making process of a real-world ETO industrial setting. Monte Carlo simulation is employed to assess the simultaneous impact of multiple constraints on the robustness of the generated solutions. The computational results are adherent to the industry setting studied and show the effects of the conservatism level on the optimal values of the generated plans. To the best of our knowledge, this is the first robust optimization model for tactical capacity planning that explicitly addresses the ETO context.

History

Related Materials

  1. 1.
    DOI - Is published in 10.1016/j.ijpe.2016.07.019
  2. 2.
    ISSN - Is published in 09255273

Journal

International Journal of Production Economics

Volume

180

Start page

158

End page

171

Total pages

14

Publisher

Elsevier

Place published

Netherlands

Language

English

Copyright

© 2016 Elsevier B.V. All rights reserved.

Former Identifier

2006064398

Esploro creation date

2020-06-22

Fedora creation date

2016-08-25

Usage metrics

    Scholarly Works

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC