RMIT University
Browse

Tactical capacity planning in a real-world ETO industry case: An action research

journal contribution
posted on 2024-11-01, 19:01 authored by Andrea Carvalho, Fabricio Pinheiro De Oliveira, Luiz Scavarda
Many engineering-to-order (ETO) organizations are multi-project capacity-driven production systems in which capacity planning is of major importance in the order acceptance phase. The academic literature, in this area, presents a research-practice gap with a lack of studies on the application of decision support tools to address capacity planning problems in real-world ETO settings. To reduce this gap, this paper presents the findings from an action research on the application of an optimization model to support tactical capacity planning in a medium-sized project-driven ETO organization. To properly model the studied environment, the proposed solution includes the representation of overlapping and variable intensity activities and the use of nonregular capacity options (e.g., overtime, hiring workers, subcontracting). The model was fed with real-world data and solved in order to check whether it actually reflects the planning problem. Furthermore, alternative scenarios were also generated to assist the management board in the order acceptance phase. As for practical implications, for the company manufacturing team, the model´s application enhanced the decision-making process regarding tactical capacity planning, addressing different shortcomings of the current planning method. Moreover, the proposed solution represents a diagnostic and decision support tool because it helps this team to identify the potential gaps between capacity and demand and also it demonstrates how to adapt capacity to demand and how to optimally balance demand. From an academic perspective, this research adds empirical evidence to enrich the existing literature, as it not only presents a real case application, but also highlights issues that either are not entirely explored in other studies or must be adapted to properly model a specific but real-world production setting.

History

Related Materials

  1. 1.
    DOI - Is published in 10.1016/j.ijpe.2015.05.032
  2. 2.
    ISSN - Is published in 09255273

Journal

International Journal of Production Economics

Volume

167

Start page

187

End page

203

Total pages

17

Publisher

Elsevier

Place published

Netherlands

Language

English

Copyright

© 2015 Elsevier B.V. All rights reserved.

Former Identifier

2006055762

Esploro creation date

2020-06-22

Fedora creation date

2015-11-25

Usage metrics

    Scholarly Works

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC