RMIT University
Browse

The costs of rework: insights from construction and opportunities for learning

journal contribution
posted on 2024-11-02, 10:01 authored by Peter Love, Jim Smith, Fran Ackermann, Zahir Irani, Poh Lian TeoPoh Lian Teo
During the production of artefacts in construction, there is a likelihood for errors to be committed, which may need to be rectified so that they conform to defined contractual requirements and standards. In doing so, this initiates a process of rework, which is a problem that the industry has incessantly aimed to redress for decades with limited success. Rework is a 'known-unknown', but there remains a high degree of uncertainty about its costs. Such uncertainty occurs as there is a proclivity for the costs associated with rework to be largely ignored, concealed or considered to be normal function of operations. This paper presents the results from the first longitudinal and in-depth study of rework costs in construction. Based on a sample of 19,605 rework events derived from 346 construction projects delivered by a contractor between the years 2009 and 2015, it was revealed that their mean yearly profit over the period of analysis was reduced by a staggering 28%. In addition, 88 (0.45%) of the total 19,605 rework events accounted for 34% of the total costs that were incurred. The complete cost data for 98 of the 346 projects was made available, which enabled a mean rework cost of 0.39% of contract value to be determined. The research provides construction organizations with an improved understanding of the nature and likelihood of rework costs enabling them to move from a position of being a 'known-unknown' to becoming a 'known-known'. Being able to 'anticipate what might go wrong' and ensure that risk management and controls are put in place throughout the construction process will contribute to their dynamic capability.

Funding

Containment and reduction of rework in offshore oil and gas projects

Australian Research Council

Find out more...

History

Related Materials

  1. 1.
    DOI - Is published in 10.1080/09537287.2018.1513177
  2. 2.
    ISSN - Is published in 09537287

Journal

Production Planning & Control

Volume

29

Issue

13

Start page

1082

End page

1095

Total pages

14

Publisher

Taylor and Francis

Place published

United Kingdom

Language

English

Copyright

© 2018 Informa UK Limited, trading as Taylor & Francis Group.

Former Identifier

2006088290

Esploro creation date

2020-06-22

Fedora creation date

2019-02-21

Usage metrics

    Scholarly Works

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC